Show Less
You do not have access to this content

Organizational Project Management

Theory and Implementation

Ralf Müller, Nathalie Drouin and Shankar Sankaran

This concise text introduces an integrated view of all project management-related activities in an organization, called Organizational Project Management (OPM). Practical cases from several organizations, as well as popular theories such as the Resource-Based Theory and Institutional Theory provide for an insightful yet realistic understanding of OPM as an integrative tool for organizations to improve their efficiency and effectiveness.
Show Summary Details
This content is available to you

References

Ralf Müller, Nathalie Drouin and Shankar Sankaran

Accenture (2010). The Value of a PMO. Retrieved from https://www.apm.org.uk/sites/default/files/protected/8.accenture.pdf.
AIPMO (2017). PMO Principles. (E. Roden, R. Joslin and R. Müller, eds). Wollerau, CH: AIPMO.
Akgün, A. E., Lynn, G. S. and Byrne, J. C. (2003). Organizational learning:A socio-cognitive framework. Human Relations, 56(7), 839–868.
Albert, S. and Whetten, D. A. (1985). Organizational identity. Research in Organizational Behavior, 7, 263–295.
APM (2011). Directing Change:A Guide to Governance of Project Management. Princes Risborough, UK: Association for Project Management.
APM (2019a). What is P3M Management? Retrieved 19 February 2019 from https://www.apm.org.uk/body-of-knowledge/p3-management/.
APM (2019b). APM Benefit Management SIG Release Two New Thought Leadership Reports. Retrieved 19 February 2019 from https://www.apm.org.uk/news/apm-benefit-management-sig-release-two-new-thought-leadership-reports/.
Aras, G. and Crowther, D. (2010). Corporate social responsibility: A broader view of corporate governance. In G. Aras and D. Crowther(eds), A Handbook of Corporate Governance and Social Responsibility. Farnham, UK: Gower Publishing Limited.
Argyris, C. (1960). Understanding Organizational Behavior. Homewood,IL: Dorsey Press.
Artto, K., Kujala, J., Dietrich, P. and Martinsuo, M. (2008). What is project strategy? International Journal of Project Management, 26(1), 4–12. https://doi.org/10.1016/j.ijproman.2007.07.006.
Arvidsson, N. (2009). Exploring tensions in projectified matrix organisations. Scandinavian Journal of Management, 25(1), 97–107.
Ashurst, C., Doherty, N. and Peppard, J. (2008). Improving the impact of IT development projects: The benefits realization capability model. European Journal of Information Systems, 17(4), 352–370.
Atkinson, R. (1999). Project management: Cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteria. International Journal of Project Management, 17(6), 337–342.doi:10.1016/s0263-7863(98)00069-6.
Aubry, M. and Hobbs, B. (2011). A fresh look at the contribution of project management to organizational performance. Project Management Journal, 42(1), 3–16. https://doi.org/10.1002/pmj.
Aubry, M. and Lavoie-Tremblay, M. (2017). Organizing for the management of projects: The Project Management Office in the dynamics of organizational design. In S. Sankaran, R. Müller and N. Drouin (eds), The Cambridge Handbook of Organizational Project Management (pp. 119–133). Cambridge, UK: Cambridge University Press.
Aubry, M. and Lavoie-Tremblay, M. (2018). Rethinking organizational design for managing multiple projects. International Journal of Project Management, 36(1), 12–26. https://doi.org/10.1016/j.ijproman.2017.05.012.
Aubry, M., Hobbs, B. and Müller, R. (2010). Images of PMOs: Results from a multi-phase research program. In B. Sandrino-Arndt, R. L. Thomas and L. Becker (eds), Handbuch Project Management Office (1st ed., pp.301–321). Düsseldorf, Germany: Symposion Publishing.
Aubry, M., Hobbs, B. and Thuillier, D. (2007). A new framework for understanding organisational project management through the PMO. International Journal of Project Management, 25(4), 328–336. https://doi.org/10.1016/j.ijproman.2007.01.004.
Aubry, M., Müller, R. and Glückler, J. (2012). Governance and Communities of PMOs. Newton Square, PA: Project Management Institute.
Aubry, M., Hobbs, B., Müller, R. and Blomquist, T. (2011). Identifying the Forces Driving Frequent Change in PMOs. Newtown Square, PA: Project Management Institute, Inc.
Badewi, A. and Shehab, E. (2016). The impact of organizational project benefits management governance of ERP project success: Neo-institutional theory perspective. International Journal of Project Management, 34,412–428.
Bahrami, A. (1998). Object Oriented Systems Development. McGraw-Hill Professional.
Barki, H. and Pinsonneault, A. (2005). A model of organizational integration, implementation effort, and performance. Organization Science,16(2), 165–179. doi:10.1287/orsc.1050.0118.
Barney, J. (1986). Strategic factor markets: Expectations, luck, and business strategy. Management Science, 32, 1231–1241.
Barney, J. (1991). Firm resources and sustained competitive advantage. Journal of Management, 17(1), 99–120. doi:10.1177/014920639101700108.
Barney, J. B. (1997). Gaining and Sustaining Competitive Advantage. Reading, MA: Addison-Wesley Publishing Company.
Barney, J. B., Ketchen Jr, D. J. and Wright, M. (2011). The future of resource-based theory: Revitalization or decline? Journal of Management, 37(5), 1299–1315.
Barney, J. B., Wright, M. and Ketchen, D. J. (2001). The resource-based view of the firm: Ten years after 1991. Journal of Management, 27(6), 625–643.
Barry, D. (2011). Re-designing organization design. Paper presented at the Design Business Conference, 17–18 November, Barcelona.
Barthes, R. (2013). Mythologies. New York: Hill & Wang.
Bass, B. M. (1990). From transactional to transformational leadership:Learning to share the vision. Organizational Dynamics, 18(3), 19–31.
Bassi, A., Vigato, S., Buffoni, L., Bonetti, M., Lucia, G. and Vaccargiu,R. (2018). PMO and project success: The importance of a project management structure. In Proceedings of Management, Knowledge and Learning, International Conference (pp. 313–328). Naples, Italy: TIIM.
Battilana, J. (2006). Agency and institutions: The enabling role of individual’s social position. Organization, 13(5), 653–676.
Beer, S. (1981). Brain of the Firm (2nd ed.). Chichester, UK: John Wiley &Sons, Ltd.
Beer, S. (1984). The viable systems model: Its provenance, development, methodology and pathology. Journal of the Operational Research Society, 35(1), 7–25.
Bennis, W. and Nanus, B. (1985). Leaders: The Strategies for Taking Charge. New York: Harper and Row.
Biedenbach, T. and Müller, R. (2012). Absorptive, innovative and adaptive capabilities and their impact on project and project portfolio performance. International Journal of Project Management, 30(5), 621–635.
Biesenthal, C., Clegg, S., Mahalingam, A. and Sankaran, S. (2018). Applying institutional theory to megaprojects. International Journal of Project Management, 36(1), 43–54.
Blaikie, N. and Priest, J. (2017). Social Research: Paradigms in Action. Cambridge, UK: Polity Press.
Blomquist, T. and Müller, R. (2006). Middle Managers in Program and Portfolio Management: Practice, Roles and Responsibilities. Newton Square, PA: Project Management Institute.
Borgatti, S. P. and Foster, P. C. (2003). The network paradigm in organizational research: A review and typology. Journal of Management, 29(6),991–1013. doi:10.1016/s0149-2063_03_00087-4.
Bornstein, L. (2010). Mega-projects, city-building and community benefits. City, Culture and Society, 1(4), 199–206. doi:10.1016/j.ccs.2011.01.006.
Bourgault, M., Drouin, N. and Hamel, E. (2008). Decision-making within distributed project teams: An exploration of formalization and autonomy as determinants of success. Project Management Journal, 39(S1),S97–S110.
Bourgault, M., Drouin, N., Daoudi, J. and Hamel, E. (2009). Understanding Decision-Making within Distributed Project Teams. Upper Darby, PA:PMI Publications.
Boyd, B. K., Bergh, D. D. and Ketchen, D. J. (2010). Reconsidering the reputation-performance relationship: A resource-based view. Journal of Management, 36(3), 588–609.
Bradley, G. (2010). Benefits Realization Management: A Practical Guide to Achieving Benefits Through Change (2nd ed.). Farnham: Gower.
Bradley, G. (2014). Benefits realization management. In J. R. Turner(ed.), Gower Handbook of Project Management (5th ed., pp.123–138). Aldershot: Ashgate Publishing.
Brady, T. and Davies, A. (2004). Building project capabilities: From exploratory to exploitative learning. Organization Studies, 25(9), 1601–1621.
Brass, D. J., Galaskiewicz, J., Greve, H. R. and Tsai, W. (2004). Taking stock of networks and organizations: A multilevel perspective. Academy of Management Journal, 47(6), 795–817. doi:10.5465/20159624.
Breese, R. (2012). Benefits realisation management: Panacea or false dawn? International Journal of Project Management, 30(3), 341–351.
Bresnen, M. (2016). Institutional development, divergence and change in the discipline of project management. International Journal of Project Management, 34(2), 328–338.
Brown, T. (2008). Design thinking. Harvard Business Review, June, 85–92.
Burke, C. S., Fiore, S. M. and Salas, E. (2003). The role of shared cognition in enabling shared leadership and team adaptability. In C. L. Pearce and J. A. Conger (eds), Shared Leadership (pp. 103–122). Thousand Oaks,CA: SAGE Publications Inc.
Burns, T. and Stalker, G. M. (1961). The Management of Innovation. London: Tavistock.
Butler, S. (2018). Portfolio governance. In D. Lock and R. Wagner (eds),Handbook of Project Portfolio Management (pp. 155–166). London:Routledge.
Byars, L. L. and Neil, T. C. (1987). Organizational philosophy and mission statements. Planning Review, 15(4), 32–35.
Cadbury (1992). The Financial Aspects of Corporate Governance. London:Gee (a division of Professional Publishing Ltd), London, UK.
Castanias, R. P. and Helfat, C. E. (1991). Managerial resources and rents. Journal of Management, 17(1), 155–171.
Chandler, A. D. (1962). Strategy and Structure: Chapters in the History of the American Industrial Enterprise. Cambridge, MA: MIT Press.
Chandra, C. and Kumar, S. (2001). Enterprise architectural framework for supply-chain integration. Industrial Management & Data Systems,101(6), 290–304. doi:10.1108/eum0000000005578.
Chi, C. S. F. and Javernick-Will, A. N. (2011). Institutional effects on project arrangement: High-speed rail projects in China and Taiwan. Construction Management and Economics, 29(6), 595–611.
Chiang, R. H.-L., Lim, E. P. and Storey, V. C. (2000). A framework for acquiring domain semantics and knowledge for database integration. Data Base for Advances in Information Systems, 31(2), 46–64.
Chih, Y. and Zwikael, O. (2015). Project benefit management: A conceptual framework of target benefit formulation. International Journal of Project Management, 33(2), 352–362. https://doi.org/10.1016/j.ijproman.2014.06.002.
Child, J. (2005). Organization: Contemporary Principles and Practice. Malden, MA: Blackwell Publishing.
Child, J. (2015). Organization: Contemporary Principles and Practice (2nd ed.). Chichester: John Wiley.
Chiva, R. and Alegre, J. (2005). Organizational learning and organizational knowledge: Towards the integration of two approaches. Management Learning, 36(1), 49–68.
Cicmil, S., Hodgson, D., Lindgren, M. and Packendorff, J. (2009). Project management behind the facade. Ephemera, 9(2), 78–92.
Clarke, N., D’Amato, A., Higgs, M. and Vahidi, R. (2018). Responsible Leadership in Projects: Insights into Ethical Decision Making. Newtown Square, PA: Project Management Institute.
Clarke, T. (2004). The stakeholder corporation: A business philosophy for the information age. In Theories of Corporate Governance:The Philosophical Foundations of Corporate Governance (pp. 189–202). London: Routledge.
Clegg, S. R. (1994). Weber and Foucault: Social theory for the study of organizations. Organization, 1(1), 149–178.
Clegg, S. R. (2019). Governmentality. Project Management Journal, 50(3), 1–4. https://doi.org/10.1177/8756972819841260.
Clegg, S., Kornberger, M. and Pitsis, T. (2006). Managing and Organizations: An Introduction to Theory and Practice. London: Sage.
Clegg, S., Killen, C. P., Biesenthal, C. and Sankaran, S. (2018). Practices,projects and portfolios: Current research trends and new directions. International Journal of Project Management, 36, 762–772.
Clegg, S. R., Pitsis, T. S., Rura-Polley, T. and Marosszeky, M. (2002). Governmentality matters: Designing an alliance culture of inter-organizational collaboration for managing projects. Organization Studies, 23(3), 317–337.
Clegg, S. R., Schweitzer, J., Whittle, A. and Pietilis, C. (2017). Strategy:Theory and Practice. London: SAGE.
Conner, K. R. (1991). A historical comparison of resource-based theory and five schools of thought within industrial organization economics: Do we have a new theory of the firm? Journal of Management, 17(1), 121–154.
Cooke-Davies, T. (2004). Project success. In P. W. G. Morris and J. K. Pinto(eds), The Wiley Guide to Managing Projects (pp. 99–122). Hoboken,NJ: John Wiley & Sons.
Cooper, R. G., Edgett, S. J. and Kleinschmidt, E. J. (1997). Portfolio management in new product development: Lessons from the leaders – I. Research & Technology Management, 40(5), 16–28.
Cooper, R. G., Edgett, S. J. and Kleinschmidt, E. J. (1999). New product portfolio management: Practices and performance. Journal of Product Innovation Management, 16(4), 333–351.
Cooper, R. G., Edgett, S. J. and Kleinschmidt, E. J. (2001a). Portfolio management of new product development: Results of an industry practice study. R&D Management, 31(4), 361–380.
Cooper, R. G., Edgett, S. J. and Kleinschmidt, E. J. (2001b). Portfolio Management of New Products (2nd ed.). Cambridge, MA: Perseus Books.
Cooper, R. G., Edgett, S. J. and Kleinschmidt, E. J. (2004). Benchmarking best NPD practices – I. Research Technology Management (January–February), 31–43.
Cox, J. F., Pearce, C. L. and Perry, M. L. (2003). Toward a model of shared leadership and distributed influence in the innovation process: How shared leadership can enhance new product development team dynamics and effectiveness. In C. L. Pearce and J. A. Conger (eds), Shared Leadership(pp. 48–76). Thousand Oaks, CA: SAGE Publications Inc, USA.
Crawford, L. (2006). Developing organizational project management capability: Theory and practice. Project Management Journal, 36(3),74–97.
Crawford, L., Cooke-Davies, T., Hobbs, B., Labuschagne, L., Remington,K. and Chen, P. (2008). Governance and support in the sponsoring of projects and programs. Project Management Journal, 39 (Supplement),S43–S55.
Cunliffe, A. (2008). Organization Theory. London: Sage Publications.
Daft, R. L., Murphy, J. and Wilmott, H. (2014). Organization Theory and Design (2nd ed.). Hampshire: Cengage Learning.
Dammer, H. and Gemünden, H. G. (2006). Qualität von Multiprojekt management messbar machen. http://www.projektmagazin.de, 08/2006: S. 1–7.
D’Aveni, R. A. (1994). Hypercompetition: Managing the Dynamics of Strategic Manoeuvring. New York: The Free Press.
Davies, A. and Hobday, M. (2005). The Business of Projects: Managing Innovation in Complex Products and Systems. Cambridge, UK: Cambridge University Press.
Davis, J. H., Schoorman, F. D. and Donaldson, L. (1997). Toward a stewardship theory of management. Academy of Management Review, 22(1),20–47.
Dean, M. (2010). Governmentality: Power and Rule in Modern Society (2nd ed.). London: SAGE Publications Ltd.
Dearden, J. (1972). MIS is a mirage. Harvard Business Review, 50(1), 90–99.
Demb, A. and Neubauer, F. (1992). The Corporate Board: Confronting the Paradoxes. New York: Oxford University Press, USA.
Dille, T. and Söderlund, J. (2011). Managing inter-institutional projects:The significance of isochronisms, timing norms and temporal misfits. International Journal of Project Management, 29(4), 480–490.
DiMaggio, P. J. and Powell, W. W. (1983). The iron cage revisited:Institutional isomorphism and collective rationality in organizational fields. American Sociological Review, 48(2), 147–160.
Dingle, J., Topping, D. and Watkinson, M. (1995). Procurement and contract strategy. In R. Turner (ed.), The Commercial Project Manager (pp.243–267). Maidenhead, UK: McGraw-Hill.
Donaldson, T. and Preston, L. E. (1995). The stakeholder theory of the corporation: Concepts, evidence and implications. Academy of Management Review, 20(1), 65–91.
Dougherty, D. and Hardy, C. (1996). Sustained product innovation in large, mature organizations: Overcoming innovation-to-organization problems. Academy of Management Journal, 39(5), 1120–1153. doi:10.2307/256994.
Drouin, N. and Besner, C. (2012). Projects and organisations: Adding rungs to the ladder of understanding project management and its relationship with the organization. International Journal of Managing Projects in Business, 5(2), 175–179.
Drouin, N., Müller, R. and Sankaran, S. (2017). The nature of organizational project management through the lens of integration. In S. Sankaran, R. Müller and N. Drouin (eds), Cambridge Handbook of Organizational Project Management (chapter 1). Cambridge, UK:Cambridge University Press.
Drouin, N., Sankaran, S. and Müller, R. (2016). The nature of organizational project management and its role as an organizational capability. In Proceedings of the 16th EURAM Conference, 1–4 June, Paris, France.
Drouin, N., Müller, R., Sankaran, S. and Vaagaasar, A. L. (2018). Balancing vertical and horizontal leadership in projects: Empirical studies from Australia, Canada, Norway and Sweden. International Journal of Managing Projects in Business, 11(4), 986–1006. https://doi.org/10.1108/IJMPB-01-2018-0002.
Dulewicz, V. and Higgs, M. (2003). A new approach to assessing leadership dimensions, styles & context. Competency & Emotional Intelligence Quarterly, 11(2), 224–232.
Dvir, D., Raz, T. and Shenhar, A. J. (2004). An empirical analysis of the relationship between project planning and project success. International Journal of Project Management, 21(2), 89–95.
Dyer, J. H. (1997). Effective interim collaboration: How firms minimize transaction costs and maximise transaction value. Strategic Management Journal, 18(7), 535–556. doi:10.1002/(sici)1097-0266(199708)18:73.3.co;2-q.
Dyer, J. H. and Singh, H. (1998). The relational view: Cooperative strategy and sources of interorganizational competitive advantage. Academy of Management Review, 23(4), 660–679. doi:10.2307/259056.
Easterby-Smith, M. and Prieto, I. M. (2008). Dynamic capabilities and knowledge management: An integrative role for learning? British Journal of Management, 19(3), 235–249.
EE website (2019). Retrieved 28 February.
Eisenhardt, K. M. (1989). Agency theory: An assessment and review. The Academy of Management Review, 14(1), 57–74.
Endres, S. and Weibler, J. (2017). Towards a three-component model of relational social constructionist leadership: A systematic review and critical interpretive synthesis. International Journal of Management Reviews, 19(2), 214–236. https://doi.org/10.1111/ijmr.12095.
Englund, R. L. and Graham, R. J. (1999). From experience: Linking strategy to projects. Journal of Product Innovation Management, 16(1),52–64.
Engwall, M. (2003). No project is an island: Linking projects to history and context. Research Policy, 32(5), 789–808.
Ernst & Young (2006). Survey of Project Management Practices. Hungary:Ernst & Young.
Faems, D., Van Looy, B. and Debackere, K. (2005). Interorganizational collaboration and innovation: Toward a portfolio approach. Journal of Product Innovation Management, 22(3), 238–250. doi:10.1111/j.0737-6782.2005.00120.x.
Fayol, H. (1949). General and Industrial Management (trans. C. Storrs). London: Pitman.
Fiol, C. M. (1991). Managing culture as a competitive resource: An identity-based view of sustainable competitive advantage. Journal of Management, 17(1), 191–211.
Fleming, Q. W., Koppelman, J. M. and Pennypacker, J. S. (1996). Earned Value Project Management. Newtown Square, PA: Project Management Institute.
Follet, M. P. (1926). The giving of orders. In H. C. Metcalf (ed.), Scientific Foundations of Business Administration (pp. 29–37). Baltimore, MD: Williams & Williams.
Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19. https://doi.org/10.1002/pmj.
Flyvbjerg, B., Bruzelius, N. and Rothengatter, W. (2003). Megaprojects and Risk: An Anatomy of Ambition. Cambridge, UK: Cambridge University Press.
Flyvbjerg, B., Holm, M. S. and Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3), 279–295.
Foucault, M. (1991). Governmentality. In G. Burchel, C. Gordon and P. Miller (eds), The Foucault Effect (pp. 87–104). Chicago, IL: University of Chicago Press.
Freeman, R. E. (1984). Strategic Management: A Stakeholder Approach. Boston, MA: Pitman.
Gaddis, P. O. (1959). The Project Manager. Harvard Business Review,(May–June), 89–97.
Galbraith, J. R. (2014). Designing Organizations: Strategy, Process, Structure at the Business Unit and Enterprise Level (3rd ed.). San Francisco, CA: Jossey-Bass.
Gareis, R. (2004). Management of the project-oriented company. In P. W. G. Morris and J. K. Pinto (eds), Wiley Guide to Managing Projects(pp. 123–143). Hoboken, NJ: John Wiley.
Gareis, R. and Huemann, M. (2007). Maturity models for the project-oriented company. In J. R. Turner (ed.), Gower Handbook of Project Management (4th ed., pp.183–208). Aldershot, UK: Gower Publishing Ltd.
Ghosh, P. P. and Varghese, J. C. (2004). Globally distributed product development using a new project management framework. International Journal of Project Management, 22(8), 669–678.
Giddens, A. (1984). The Constitution of Society. Polity Press: Oxford.
Glouberman, S. and Mintzberg, H. (2001). Managing the care of health and the cure of disease – Part II: Integration. Health Care Management Review, 26(1), 70–84.
Gobeli, D. H. and Larson, E. W. (1987). Relative effectiveness of different project structures. Project Management Journal, 18(2), 81–85.
Goleman, D. (2001). An EI-based theory of performance. In G. Cherniss and D. Goleman (eds), The Emotionally Intelligent Workplace. San Francisco, CA: Jossey-Bass.
Grabher, G. (2002). Cool projects, boring institutions: Temporary collaboration in social context. Regional Studies, 36(3), 205–214.
Grant, R. M. (1991). The resource-based theory of competitive advantage:Implications for strategy formulation. California Management Review,33(3), 114–135.
Grant, R. M. (1996). Toward a knowledge-based theory of the firm. Strategic Management Journal, 17(S2), 109–122. doi:10.1002/smj.4250171110.
Gray, D. E. (2014). Doing Research in the Real World. London: Sage.
Greenwood, R. and Miller, D. (2010). Tackling design anew: Getting back to the heart of organizational theory. Academy of Management Perspectives, 24(4), 78–88.
Grieve, G. P. (2014). Government Map II. Governmentality. Retrieved 28 February 2019 from http://www.gpgrieve.org/3maps/gmap2.html.
Hagedoorn, J. and Duysters, G. (2002). Learning in dynamic inter-firm networks: The efficacy of multiple contacts. Organization Studies, 23(4),525–548. doi:10.1177/0170840602234002.
Haimes, Y. Y., Crowther, K. and Horowitz, B. M. (2008). Homeland security preparedness: Balancing protection with resilience in emergent systems. Systems Engineering, 11(4), 287–308.
Hamel, G. and Prahalad, C. K. (1994). Competing for the future. Harvard Business Review, 72(4), 122–128.
Hamel, G. and Prahalad, C. K. (1996). Competing for the Future. Brighton,MA: Harvard Business Press.
Harrison, J., Hitt, M., Hoskisson, R. and Ireland, D. (1991). Synergies and post-acquisition performance: Differences versus similarities in resource allocations. Journal of Management, 17(1), 173–190.
Hatch, M. J. and Cunliffe, A. L. (2013). Organization Theory: Modern,Symbolic and Postmodern Perspectives (3rd ed.). Oxford, UK: Oxford University Press.
Helfat, C. E. (2000). Guest editor’s introduction to the special issue: The evolution of firm capabilities. Strategic Management Journal, 21(10–11),995–960.
Helfat, C. E. and Peteraf, M. A. (2003). The dynamic resource-based view:Capability lifecycles. Strategic Management Journal, 24(10), 997–1010.
Henderson, R. (1994). The evolution of integrative capability: Innovation in cardiovascular drug discovery. Industrial and Corporate Change, 3(3),607–630. doi:10.1093/icc/3.3.607.
Henisz, W. J., Levitt, R. E. and Scott, W. R. (2011). Toward a unified theory of project governance: Economic, sociological and psychological supports for relational contracting. Engineering Project Organization Journal, 2, 37–55.
Hernandez, M. (2012). Toward an understanding of the psychology of stewardship. Academy of Management Review, 37(2), 172–193. https://doi.org/10.5465/amr.2010.0363.
Hersey, P. and Blanchard, K. H. (1988). Management of Organizational Behaviour. Englewood Cliffs, NJ: Prentice Hall.
Herzberg, F. (1959). The Motivation to Work. New York: Wiley.
Hobbs, B. and Andersen, B. (2000). Partnering alliances for project design and execution. In R. Miller and D. R. Lessard (eds), The Strategic Management of Large Engineering Projects: Shaping Institutions, Risks and Governance (pp. 181–196). Boston, MA: MIT Press.
Hobbs, B. and Aubry, M. (2007). A multi-phase research program investigating project management offices (PMOs): The results of phase 1. Project Management Journal, 38(1), 74–86.
Hobbs, B., Aubry, M. and Thuillier, D. (2008). The Project Management Office as an organizational innovation. International Journal of Project Management, 26(5), 547–555.
Hobday, M. (2000). The project-based organisation: An ideal form for managing complex products and systems? Research Policy, 29(2000),871–893.
Hofstede, G. and Hofstede, G. J. (1991). Cultures and Organizations:Software of the Mind. New York: McGraw-Hill.
Huemann, M. (2014). Managing the project-oriented organization. In R. J. Turner (ed.), Gower Handbook of Project Management (5th ed.). Aldershot: Gower.
Iansiti, M. and Clark, K. B. (1994). Integration and dynamic capability:Evidence from product development in automobiles and mainframe computers. Industrial and Corporate Change, 3(3), 557–605. doi:10.1093/icc/3.3.557.
Iansiti, M. and Levien, R. (2004). The Keystone Advantage: What the New Dynamics of Business Ecosystems Mean for Strategy, Innovation, and Sustainability. Boston, MA: Harvard Business School Press.
Ibbs, C. W. and Kwak, Y. H. (2000). Assessing project management maturity. Project Management Journal, 31(1), 32–43.
InfoQ (2015). Standish Group 2015 Chaos Report – Q&A with Jennifer Lynch. Retrieved 14 February 2019 from https://www.infoq.com/articles/standish-chaos-2015.
Infrastructure and Projects Authority (2016). National Infrastructure Delivery Plan 2016–2021. Retrieved from Gov.UK website: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/520086/2904569_nidp_deliveryplan.pdf.
IPMA (1999). IPMA Competence Baseline. Monmouth, UK: International Project Management Association.
Ireland, R. D., Hitt, M. A. and Vaidyanath, D. (2002). Alliance management as a source of competitive advantage. Journal of Management, 28(3), 413–446. doi:10.1016/s0149-2063(02)00134-4.
ISO (2017). Project, Programme and Portfolio Management – Guidance on Governance. Geneva, Switzerland: ISO Copyright Office.
Jackson, M. (1991). Systems Methodology and the Management Sciences. New York: Springer.
Jaradat, R. M. (2015). Complex system governance requires systems thinking – how to find systems thinkers. International Journal of System of Systems Engineering, 6(1/2), 53–70. https://doi.org/10.1504/IJSSE.2015.068813.
Jenner, S. (2010). Guest editorial: Portfolio management special issue. Project: October, 3.
Jensen, M. C. and Meckling, W. H. (1976). Theory of the firm: Managerial behavior, agency costs and ownership structure. Journal of Financial Economics, 3(4), 305–360.
Johansen, K., Comstock, M. and Winroth, M. (2005). Coordination in collaborative manufacturing mega-networks: A case study. Journal of Engineering and Technology Management, 22(3), 226–244. doi:10.1016/j.jengtecman.2005.06.005.
Johns, G. (2006). The essential impact of content on organizational behavior. Academy of Management Review, 31(2), 386–408. https://doi.org/10.5465/AMR.2006.20208687.
Joslin, R. and Müller, R. (2016). The relationship between project governance and project success. International Journal of Project Management, 34(4). https://doi.org/10.1016/j.ijproman.2016.01.008.
Jugdev, K. (2004). Through the looking glass: Examining theory development in project management with the resource-based view lens. Project Management Journal, 35(3), 15–26.
Jugdev, K. (2017). Strengthening the connection between strategy and organizational project management. In S. Sankaran, R. Müller and N. Drouin (eds), Cambridge Handbook of Organizational Project Management (pp. 44–54). Cambridge, MA: Cambridge University Press.
Jugdev, K. and Müller, R. (2005). A retrospective look at our evolving understanding of project success. Project Management Journal, 36(4), 19–31.
Kamoche, K. N. (2001). Understanding Human Resource Management. Buckingham, UK: Open University Press.
Keegan, A. and Den Hartog, D. N. (2004). Transformational leadership in a project-based environment: A comparative study of the leadership styles of project managers and line managers. International Journal of Project Management, 22(8), 609–618.
Keegan, A. and Turner, R. (2002). The management of innovation in project-based firms. Long Range Planning, 35(4), 367–388.
Killen, C. P. and Drouin, N. (2017). Project portfolio management. In S. Sankaran, R. Müller and N. Drouin (eds), Cambridge Handbook of Organizational Project Management (pp. 55–69). Cambridge, MA: Cambridge University Press.
Killen, C. P. and Hunt, R. A. (2010). Dynamic capability through project portfolio management in service and manufacturing industries. International Journal of Managing Projects in Business, 3(1), 157–169.
Klakegg, O. J. and Volden, G. H. (2017). Governance in public projects:The Norwegian case. In R. Müller (ed.), Governance and Governmentality for Projects: Enablers, Practices and Consequences (pp. 129–156). New York: Routledge.
Knapp, M. (2018). Enterprise Portfolio Governance. Singapore: Springer Nature.
Kodama, M. (2005). Knowledge creation through networked strategic communities. Long Range Planning, 38(1), 27–49. doi:10.1016/j.lrp.2004.11.011.
Kohlbacher, M. (2010). The effects of process orientation: A literature review. Business Process Management Journal, 16(1), 135–152.
Konstantinou, E. and Müller, R. (2016). The role of philosophy in project management. Project Management Journal, 47(3), 3–11.
Kopmann, J., Kock, A. and Killen, C. P. (2017). Project portfolio management. In S. Sankaran, R. Müller and N. Drouin (eds), Cambridge Handbook of Organizational Project Management (pp. 92–105). Cambridge, MA: Cambridge University Press.
Kremmel, T., Kubalík, J. and Biffl, S. (2011). Software project portfolio optimization with advanced multi-objective evolutionary algorithm. Applied Soft Computing, 11, 1416–1426.
Kuhn, T. (1996). The Structure of Scientific Revolutions. London:University of Chicago Press.
Larcker, D. and Tayan, B. (2011). Corporate Governance Matters. Upper Saddle River, NJ: Pearson Education Inc.
Larson, E. W. and Gobeli, D. H. (1989). Significance of project management structure on development success. IEEE Transactions on Engineering Management, 36(2), 119–125.
Lasser, S. and Heiss, M. (2005). Collaboration maturity and the offshoring cost barrier: The tradeoff between flexibility in team composition and cross-site communication effort in geographically distributed development projects. Proceeding of the International Professional Communication Conference (IPCC) (pp. 718–728). doi:10.1109/ipcc.2005.1494243.
Lawrence, P. R. and Lorsch, J. W. (1967). Organization and Environment. Boston, MA: Harvard Business School.
Lawrence, T. B. and Suddaby, R. (2006). Institutions and institutional work. In S. R. Clegg, C. Hardy, T. Lawrence and W. R. Nord (eds), The SAGE Handbook of Organization Studies (pp. 214–254). London: Sage Publications.
Lawson, B. and Samson, D. (2001). Developing innovation capability in organisations: A dynamic capabilities approach. International Journal of Innovation Management, 5(3), 377–400. doi:10.1142/s1363919601000427.
Lemke, T. (2007). An indigestible meal? Foucault, governmentality and state theory. Distinktion: Scandinavian Journal of Social Theory, 8(2), 43–64.
Lessard, D. R. and Miller, R. (2013). The shaping of large engineering projects. In H. Priemus and B. Van Wee (eds), International Handbook on Mega-projects (pp. 34–56). Cheltenham, UK and Northampton, MA,USA: Edward Elgar Publishing.
Lessard, D. and Voisey, C. A. (1998). Note on capabilities, competencies and resources. Unpublished paper.
Lewis, E. and Millar, G. (2009). The viable governance model – A theoretical model for the governance of IT. Proceedings of the 42nd Annual Hawaii International Conference on System Sciences, HICSS (August). https://doi.org/10.1109/HICSS.2009.458.
Li, D. (2017). Governance and governmentality at Tasly Pharmaceuticals. In R. Müller (ed.), Governance and Governmentality for Projects: Enablers, Practices and Consequences (pp. 238–248). New York: Routledge.
Lindgren, M. and Packendorff, J. (2011). Issues, responsibilities and identities: A distributed leadership perspective on biotechnology R&D management. Creativity and Innovation Management, 20(3), 157–170.
Lindkvist, L. (2004). Governing project-based firms: Promoting market-like processes within hierarchies. Journal of Management and Governance, 8, 3–25.
Lloyd-Walker, B. and Walker, D. (2011). Authentic leadership for 21st century project delivery. International Journal of Project Management, 29(4), 383–395. https://doi.org/10.1016/j.ijproman.2011.02.004.
Lundin, R. A. and Söderholm, A. (1995). A theory of the temporary organization. Scandinavian Journal of Management, 11(4), 437–455.
Lundin, R. A., Arvidsson, N., Brady, T., Ekstedt, E., Midler, C. and Sydow, J. (2015). Managing and Working in Project Society: Institutional Challenges of Temporary Organizations. Cambridge, UK: Cambridge University Press.
Luo, Y. (2002). Contract, cooperation, and performance in international joint ventures. Strategic Management Journal, 23(10), 903–919.
Mahalingam, A. and. Levitt, R. E. (2007). Institutional theory as a framework for analyzing conflicts on global projects. Journal of Construction Engineering and Management, 133(7), 517–528.
Manning, S. and Sydow, J. (2011). Projects, paths, and practices: Sustaining and leveraging project relationships. Industrial and Corporate Change, 20(5), 1369–1402.
Margolis, S. (2019). What is the philosophy of an organization? Retrieved 18 February 2019 from https://sheilamargolis.com/core-culture-and-five-ps/the-five-ps-and-organizational-alignment/philosophy/.
Maritan, C. A. and Peteraf, M. A. (2011). Invited editorial: Building a bridge between resource acquisition and resource accumulation. Journal of Management, 37(5), 1374–1389.
Martinsuo, M. (2012). Project portfolio management in practice and in context. International Journal of Project Management, 31(2), 794–803.
Maslow, A. H. (1970). Motivation and Personality. New York: Harper & Row.
Mayer, J. D., Roberts, R. D. and Barsade, J. D. (2008). Human abilities: Emotional intelligence. In Annual Review of Psychology (Vol. 59,pp.507–536). Palo Alto, CA: Annual Reviews.
Maylor, H. (2003). Project Management (3rd ed.). Harlow, UK: Pearson Education Ltd.
Maylor, H., Brady, T., Cooke-Davies, T. and Hodgson, D. (2006). From projectification to programmification. International Journal of Project Management, 24(8), 663–674.
Mertens, D. (1998). Research Methods in Education and Psychology: Integrating Diversity with Quantitative and Qualitative Approaches. Thousand Oaks, CA: Sage.
Meyer, M. M. (2018). Portfolio management software. In D. Lock and R. Wagner (eds), The Handbook of Project Portfolio Management (pp.224–233). London: Routledge.
Midler, C. (1995). ‘Projectification’ of the firm: The Renault case. Scandinavian Journal of Management, 11(4), 363–375.
Midler, C. (2015). Dimensions of projectification. Personal communication, 20 February 2015.
Miles, J. A. (2012). Management and Organization Theory. A Jossey Bass Reader. San Francisco, CA: Jossey Bass.
Milgrom, P. and Roberts, J. (1992). Economics, Organization, and Management. Englewood Cliffs, NJ: Prentice Hall.
Miller, P. and Rose, N. (1990). Governing economic life. Economy and Society, 19(1), 1–31. https://doi.org/10.1080/03085149000000001.
Millstein, I. M., Albert, M., Cadbury, A., Feddersen, D. and Tateisi,N. (1998). Improving Competitiveness and Access to Capital in Global Markets. Paris, France: OECD Publications.
Mintzberg, H. (1978). Patterns in strategy formulation. Management Science, 24(9), 934–948.
Mintzberg, H. (1981). Organizational design: Fashion or fit? Harvard Business Review, 59(1), 103–116.
Miterev, M., Engwall, M. and Jerbrant, A. (2017). Mechanisms of isomorphism in project-based organizations. Project Management Journal,48(5), 9–24.
Miterev, M., Turner, J. R. and Mancini, M. (2017). The organization design perspective on the project-based organization: a structured review. International Journal of Managing Projects in Business, 10(3), 527–549.
Miterev, M., Mancini, M. and Turner, R. (2017). Towards a design for the project-based organization. International Journal of Project Management,35, 479–491.
Monks, A. A. G. and Minow, N. (1995). Corporate Governance (4th ed.). Chichester, UK: Wiley & Sons Ltd.
Montealegre, R. (2002). A process model of capability development:Lessons from the electronic commerce strategy at Bolsa de Valores de Guayaquil. Organization Science, 13(5), 514–531. doi:10.1287/orsc.13.5.514.7808.
MoP (2011). Management of Portfolios. Norwich, UK: The Stationery Office.
Morris, P. W. G. and Geraldi, J. (2011). Managing the institutional context for projects. Project Management Journal, 42(6), 20–32.
Morris, P. and Jamieson, A. (2004). Translating Corporate Strategy into Project Strategy: Realizing Corporate Strategy through Project Management. Newtown Square, PA: Project Management Institute.
Moustafaev, J. (2017). Project Portfolio Management in Theory and Practice: Thirty Case Studies from Around the World. Boca Raton, FL:CRC Press.
Mowday, R. T. and Sutton, R. I. (1993). Organizational behavior: Linking individuals and groups to organizational contexts. Annual Review of Psychology, 44, 195–229.
MSP (2011). Managing Successful Programmes. Norwich, UK: The Stationery Office.
Müller, R. (2009). Project Governance. Farnham, UK: Gower Publishing Ltd.
Müller, R. (2011). Project governance. In P. W. G. Morris, J. K. Pinto and J. Söderlund (eds), The Oxford Handbook of Project Management (pp.297–320). Oxford, UK: Oxford University Press.
Müller, R. (2017a). Organizational project governance. In R. Müller (ed.),Governance and Governmentality for Projects: Enablers, Practice and Consequences (pp. 11–24). New York: Routledge.
Müller, R. (2017b). Tactical organizational enablers. In R. Müller (ed.),Governance and Governmentality for Projects: Enablers, Practices and Consequences (pp. 69–87). New York: Routledge.
Müller, R. (2017c). Governance models and paradigms. In R. Müller (ed.), Governance and Governmentality for Projects: Enablers, Practices and Consequences (pp. 36–50). New York: Routledge.
Müller, R. (2017d). Private sector practices. In R. Müller (ed.), Governance and Governmentality for Projects: Enablers, Practices and Consequences(pp. 107–128). New York: Routledge.
Müller, R. and Jugdev, K. (2012). Critical success factors in projects: Pinto, Slevin, and Prescott – the elucidation of project success. International Journal of Managing Projects in Business, 5(4), 757–775. https://doi.org/10.1108/17538371211269040.
Müller, R. and Lecoeuvre, L. (2014). Operationalizing governance categories of projects. International Journal of Project Management, 32(8), 1346–1357. https://doi.org/dx.doi.org/10.1016/j.ijproman.2014.04.005.
Müller, R. and Stawicki, J. (2006). A framework for building successful project-based organizations. In Proceedings of the 20 IPMA World Conference on Project Management, 16–17 October 2006, Shanghai, China.
Müller, R. and Turner, J. R. (2005). The impact of principal-agent relationship and contract type on communication between project owner and manager. International Journal of Project Management, 23(5), 398–403.
Müller, R. and Turner, J. R. (2007). Matching the project manager’s leadership style to project type. International Journal of Project Management, 25(1). https://doi.org/10.1016/j.ijproman.2006.04.003.
Müller, R. and Turner, J. R. (2010). Project-Oriented Leadership. Aldershot, UK: Gower Publishing.
Müller, R., Drouin, N. and Sankaran, S. (2019). Modeling organizational project management. Project Management Journal, 50(4), 1–15. https://doi.org/10.1177/8756972819847876.
Müller, R., Drouin, N. and Sankaran, S. (in press). Governance of organizational project management and megaprojects using the Viable Systems Model. In G. S. Metcalf, H. Deguchi and K. Kijima (eds), Springer Handbook of Systems Sciences (1st ed.). Tokyo, Japan: Translational Systems Science Series, Springer Nature.
Müller, R., Packendorff, J. and Sankaran, S. (2017). Balanced leadership:A new perspective for leadership in organizational project management. In S. Sankaran, R. Müller and N. Drouin (eds), Cambridge Handbook of Organizational Project Management (pp. 180–193). Cambridge, UK:Cambridge University Press.
Müller, R., Pemsel, S. and Shao, J. (2015). Organizational enablers for project governance and governmentality in project-based organizations. International Journal of Project Management, 33(4), 839–851.
Müller, R., Zhai, L. and Wang, A. (2017). Governance and governmentality in projects: Profiles and relationships with success. International Journal of Project Management, 35(3), 378–392.
Müller, R., Andersen, E., Klakegg, O. J. and Volden, G. H. (2017). Governance institutions. In R. Müller (ed.),Governance and Governmentality for Projects: Enablers, Practice and Consequences (pp. 51–66). New York: Routledge.
Müller, R., Zhai, L., Wang, A. and Shao, J. (2016a). A framework for governance of projects: Governmentality, governance structure and projectification. International Journal of Project Management, 34(6). https://doi.org/10.1016/j.ijproman.2016.05.002.
Müller, R., Turner, J. R., Andersen, E. S., Shao, J. and Kvalnes, Ø. (2016b). Governance and ethics in temporary organizations: The mediating role of corporate governance. Project Management Journal, 47(6), 7–23.
Müller, R., Sankaran, S., Drouin, N., Vaagaasar, A., Bekker, M. C. and Jain, K. (2018). A theory framework for balancing vertical and horizontal leadership in projects. International Journal of Project Management, 36(1), 83–94. https://doi.org/http://dx.doi.org/10.1016/j.ijproman.2017.05.011.
Nidiffer, K. E. and Dolan, D. (2005). Evolving distributed project management. IEEE Software, 22(5), 63–72. doi:10.1109/ms.2005.120.
Nogeste, K. and Walker, D. H. (2008). Development of a method to improve the definition and alignment of intangible project outcomes and tangible project outputs. International Journal of Managing Projects in Business, 1(2), 279–287. doi:10.1108/17538370810866377.
OECD (2001). Governance in the 21st Century. Paris, France: OECD. Retrieved from http://www.oecd.org/futures/17394484.pdf.
OECD (2004). OECD Principles of Corporate Governance. Paris CEDEX:OECD.
OGC (2009). Directing Successful Projects with Prince2. London: TSO.
Olson, E. E. and Eoyang, G. H. (2001). Foreword. In Facilitating Organization Change. Lessons from Complexity Science. San Francisco,CA: Wiley.
Orlicky, J. A. (1975). Material Requirements Planning: The New Way of Life in Production and Inventory Management. New York: McGraw-Hill.
Orueta, F. D. and Fainstein, S. S. (2008). The new mega-projects: Genesis and impacts. International Journal of Urban and Regional Research,32(4), 759–767. doi:10.1111/j.1468-2427.2008.00829.x.
O’Sullivan, A. (2003). Dispersed collaboration in a multi-firm, multi-team product-development project. Journal of Engineering and Technology Management, 20(1–2), 93–116. doi:10.1016/s0923-4748(03)00006-7.
Ouchi, W. G. (1980). Markets, bureaucracies and clans. Administrative Science Quarterly, 25(1), 129–141.
Oxford (2019). Principle. In Oxford Online Dictionary. Retrieved from https://en.oxforddictionaries.com/definition/principle.
Oxford Dictionary (2019). Retrieved 18 February 2019 from https://en.oxforddictionaries.com/.
Packendorff, J. (1995). Inquiring into the temporary organization: New directions for project management research. Scandinavian Journal of Management, 11(4), 319–333. https://doi.org/10.1016/0956-5221(95)00018-Q.
Pearce, C. L. and Sims, H. P. (2002). Vertical versus shared leadership as predictors of the effectiveness of change management teams: An examination of aversive, directive, transactional, transformational, and empowering leader behaviors. Group Dynamics: Theory, Research, and Practice, 6(2), 172–197. https://doi.org/10.1037/1089-2699.6.2.172.
Pellegrinelli, S. (2011). What’s in a name: Project or programme?International Journal of Project Management, 29(2), 232–240.
Pemsel, S., Müller, R. and Söderlund, J. (2016). Knowledge governance strategies in project-based organizations. Long Range Planning, 49(6), 648–660. https://doi.org/10.1016/j.lrp.2016.01.001.
Pemsel, S., Wiewiora, A., Müller, R., Aubry, M. and Brown, K. (2014). A conceptualization of knowledge governance in project-based organizations. International Journal of Project Management, 32(8), 1411–1422.
Penrose, E. (1959). The Theory of the Growth of the Firm. Oxford, UK:Basil Blackwell.
Peppard, J. (2005). The application of the viable systems model to information technology governance. In 26th International Conference on Information Systems (ICIS), Las Vegas, 11–23.
Peteraf, M. A. (1993). The cornerstones of competitive advantage: A resource-based view. Strategic Management Journal, 14(3), 179–191.doi:10.1002/smj.4250140303.
Pinto, J. K. and Slevin, D. P. (1988). Critical success factors across the project life cycle. Project Management Journal, 19(3), 67–75.
Pisano, G. and Teece, D. (1994). The dynamic capabilities of firms: An introduction. Industrial and Corporate Change, 3(3), 537–556.
Pless, M. N. (2007). Understanding responsible leadership: Roles identities and motivational drivers. Journal of Business Ethics, 74(4), 437–456.
PM Concepts (2018). Assessment tool for OPM. Unpublished internal document.
PMI (1996). A Guide to the Project Management Body of Knowledge.Newtown Square, PA: Project Management Institute.
PMI (2003). Organizational Project Management Maturity Model: Knowledge Foundation. Newtown Square, PA: Project Management Institute.
PMI (2004). A Guide to the Project Management Body of Knowledge (3rd ed.). Newtown Square, PA: Project Management Institute.
PMI (2006). The Standard for Portfolio Management. Newtown Square,PA: Project Management Institute. PMI (2008). A Guide to the Project Management Body of Knowledge(PMBoK guide) (4th ed.). Newtown Square, PA: Project Management Institute.
PMI (2013a). A Guide to the Project Management Body of Knowledge (5th ed.). Newtown Square, PA: Project Management Institute.
PMI (2013b). The Standard for Portfolio Management (3rd ed.). Newtown Square, PA: Project Management Institute.
PMI (2014). Implementing Organizational Project Management: A Practice Guide. Newtown Square, PA: Project Management Institute.
PMI (2016). Governance of Portfolios, Programs, and Projects: A Practice Guide. Newtown Square, PA: Project Management Institute.
PMI (2017a). A Guide to the Project Management Body of Knowledge(PMBoK Guide) (6th ed.). Newtown Square, PA: Project Management Institute.
PMI (2017b). The Standard for Program Management (4th ed.). Newtown Square, PA: Project Management Institute.
Powell, W. W., Koput, K. W. and Smith-Doerr, L. (1996). Interorganizational collaboration and the locus of innovation: Networks of learning in biotechnology. Administrative Science Quarterly, 41(1), 116–145.doi:10.2307/2393988.
Prahalad, C. K. and Hamel, G. (1990). The core competence of the corporation. Harvard Business Review, 68(3), 79–91.
Pretorius, S., Steyn, H. and Bond-Barnard, T. J. (2017). Exploring project-related factors that influence leadership styles and its effect on project performance: A conceptual framework. South African Journal of Industrial Engineering, 28(December), 95–108.
Priemus, H. and Van Wee, B. (eds) (2013). International Handbook on Mega-projects. Cheltenham, UK and Northampton, MA, USA:Edward Elgar Publishing.
Pugh, D. S. and Hickson, D. J. (1976). Organizational Structure in its Context: The Aston Programme 1. London: Saxon House.
Puranam, P., Gulati, R. and Battacharya, A. (2013). How much to make and how much to buy? An analysis of optimal plural sourcing strategies. Strategic Management Journal, 34(10), 1145–1161.
Quinn, R. E. and Rohrbraugh, J. (1983). A spatial model of effectiveness criteria: Towards a competing values approach to organizational analysis. Management Science, 26(5), 547–555.
Reed, D. (2002). Employing normative stakeholder theory in developing countries: A critical theory perspective. Business and Society, 41(2),166–207.
Reijers, H. A. (2006). Implementing BPM systems: The role of process orientation. Business Process Management Journal, 12(4), 389–409.
Roberts, P. W. and Dowling, G. R. (2002). Corporate reputation and sustained superior financial performance. Strategic Management Journal,23(12), 1077–1093.
Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, 1(1), 83–98.
Sah, R. K. and Stiglitz, J. E. (1991). The quality of managers in centralized versus decentralized organizations. The Quarterly Journal of Economics,106(1), 289–295.
Sainati, T., Brookes, N. and Locatelli, G. (2017). Special purpose entities in megaprojects: Empty boxes or real companies? Project Management Journal, 48(2), 55–73. doi:10.1177/875697281704800205.
Salaman, G. and Asch, D. (2003). Strategy and Capability Sustaining Organizational Change. Malden, MA: Blackwell Publishing.
Sankaran, S., Müller, R. and Drouin, N. (eds) (2017). Cambridge Handbook of Organizational Project Management. Cambridge, UK: Cambridge University Press.
Schreyögg, G. and Steinmann, H. (1987). Strategic control: A new perspective. Academy of Management Review, 12(1), 91–103.
Scott, W. R. (2011). Introduction: Studying global projects. In W. R. Scott,R. E. Levitt and R. J. Orr (eds), Global Projects: Institutional and Political Challenges (pp. 1–12). Cambridge, MA: Cambridge University Press.
Scott, W. R. (2012). The institutional environment of global projects. The Engineering Project Organization Journal, 2, 27–35.
Scott, W. R. (2014). Institutions and Organizations: Ideas, Interests and Identitites (4th ed.). Los Angeles, CA: Sage Publications.
Scranton, P. (2015). Projects as a focus for historical analysis: Surveying the landscape. History and Technology: An International Journal. https://doi.org/DOI: 10.1080/07341512.2014.1003164.
Sedlmayer, M. (2018). Delivering organizational strategy with portfolio management. In D. Lock and R. Wagner (eds), The Handbook of Project Portfolio Management (pp. 9–18). London: Routledge.
Serra, C. E. M. and Kunc, M. (2015). Benefit realisation management and its influence on project success and on the execution of business strategies. International Journal of Project Management, 33, 53–66.
Serrador, P. and Turner, J. R. (2014). The relationship between project success and project efficiency. Procedia-Social and Behavioral Sciences,119, 75–84.
Shapira, A., Laufer, A. and Shenhar, A. J. (1994). Anatomy of decision making in project planning teams. International Journal of Project Management, 12(3), 172–182. doi:10.1016/0263-7863(94)90033-7.
Sharifi, M. M. and Safari, M. (2016). Application of net cash flow at risk in portfolio selection. Project Management Journal, 47(4), 68–78.
Simard, M., Aubry, M. and Laberge, D. (2018). The utopia of order versus chaos: A conceptual framework for governance, organizational design and governmentality in projects. International Journal of Project Management, 36(3), 460–473.
Sirmon, D. G., Hitt, M. A. and Ireland, R. D. (2007). Managing firm resources in dynamic environments to create value: Looking inside the black box. Academy of Management Review, 32(1), 273–292.
Sirmon, D. G., Hitt, M. A., Ireland, R. D. and Gilbert, B. A. (2011). Resource orchestration to create competitive advantage: Breadth, depth,and life cycle effects. Journal of Management, 37(5), 1390–1412.
Söderlund, J. (2004). Building theories of project management: Past research, questions for the future. International Journal of Project Management, 22 (3), 183–191.
Söderlund, J. and Tell, F. (2011). The P-Form corporation: Contingencies,characteristics and challenges. In P. W. G Morris, J. K. Pinto and J. Söderlund (eds), The Oxford Handbook of Project Management (pp.201–223). Oxford, UK: Oxford University Press.
Söderlund, J., Vaagaasar, A. L. and Andersen, E. S. (2008). Relating,reflecting and routinizing: Developing project competence in cooperation with others. International Journal of Project Management, 26(5),517–526.
SOX (2002). A Guide to The Sarbanes-Oxley Act. Retrieved 23 September 2018 from http://www.soxlaw.com.
Standish Group (1998). CHAOS’98: A Summary Review. The Standish Group, USA.
Staudenmayer, N., Tripsas, M. and Tucci, C. L. (2005). Interfirm modularity and its implications for product development. Journal of Product Innovation Management, 22(4), 303–321. doi:10.1111/j.0737-6782.2005.00128.x.
Stuart, T. E. (2000). Interorganizational alliances and the performance of firms: A study of growth and innovation rates in a high-technology industry. Strategic Management Journal, 21(8), 791–811.doi:10.1002/1097-0266(200008)21:83.0.co;2-k.
Sydow, J. and Staber, U. (2002). The institutional embeddedness of project networks: The case of content production in German television. Regional Studies, 36(3), 215–227.
Sydow, J., Lindkvist, L. and DeFillippi, R. (2004). Project-based organizations, embeddedness and repositories of knowledge. Organization Studies, 25(9), 1475–1489.
Taylor, F. W. (1911). Principles of Scientific Management. New York: Harper.
Teece, D. J. (1998). Research directions for knowledge management. California Management Review, 40(3), 289–292.
Teece, D. J., Pisano, G. and Shuen, A. (1990). Firm capabilities. Resources and the concept of strategy. Economic Analysis and Policy Working Paper EAP, 38, University of California, Oakland, CA.
Teece, D. J., Pisano, G. and Shuen, A. (1997). Dynamic capabilities and strategic management. Strategic Management Journal, 18(7), 509–533.doi:10.1002/(sici)1097-0266(199708)18:73.0.co;2-z.
Thiry, M. (2016). Program Management. Abingdon, UK: Routledge.
Thiry, M. and Deguire, M. (2007). Recent developments in project-based organisations. International Journal of Project Management, 25(7),649–658.
Thorp, J. (2001). The Information Paradox: Realizing the Business Benefits of Information Technology. Toronto: McGraw Hill Ryerson.
Thorp, J. (2007). The Information Paradox. Toronto: Fujitsu Consulting Inc.
Tian, Q., Ma, J., Liang, J., Kwok, R. and Liu, O. (2005). An organizational decision support system for effective R&D project selection. Decision Support Systems, 39(3), 403–413. doi:10.1016/j.dss.2003.08.005.
Todeva, E. and Knoke, D. (2005). Strategic alliances and models of collaboration. Management Decision, 43(1), 123–148. doi:10.1108/00251740510572533.
Too, E. G. and Weaver, P. (2014). The management of project management: A conceptual framework for project governance. International Journal of Project Management, 32(8), 1382–1394. https://doi.org/10.1016/j.ijproman.2013.07.006.
Toor, S.-R. and Ofori, G. (2008). Leadership for future construction industry: Agenda for authentic leadership. International Journal of Project Management, 26(6), 620–630. https://doi.org/10.1016/j.ijproman.2007.09.010.
Tsoukas, H. and Chia, R. (2011). Why philosophy matters to organization theory? In R. Tsoukas and R. Chia (eds), Philosophy and Organizational Theory (pp. 1–21). Bingley, UK: Emerald Group Publishing.
Tuckman, B. W. (1965). Developmental sequence in small groups 1. Psychological Bulletin, 63(6), 384–399.
Turner, J. R. (1999). Handbook of Project-based Management: Improving the Process for Achieving Strategic Objectives (2nd ed.). New York:McGraw-Hill.
Turner, J. R. (2004). Farsighted project contract management: Incomplete in its entirety. Construction Management and Economics, 22(1), 75–83.
Turner, J. R. (ed.) (2009). The Handbook of Project-based Management: Leading Strategic Change in Organisations (3rd ed.). London: McGraw-Hill.
Turner, R. (2014). Projects and their management. In R. Turner (ed.),Gower Handbook of Project Management (5th ed., pp.19–34). Farnham,UK: Gower Publishing Ltd.
Turner, J. R. (2018). The management of the project-based organization: A personal reflection. International Journal of Project Management, 36(1),231–240.
Turner, J. and Cochrane, R. (1993). Goals-and-methods matrix: Coping with projects with ill-defined goals and/or methods of achieving them. International Journal of Project Management, 11(2), 93–102.
Turner, J. R. and Keegan, A. (2001). Mechanisms of governance in the project-based organization: Roles of the broker and steward. European Management Journal, 19(3), 254–267.
Turner, J. R. and Müller, R. (2003). On the nature of the project as a temporary organization. International Journal of Project Management, 21(1), 1–7.
Turner, J. R. and Müller, R. (2004). Communication and co-operation on projects between the project owner as principal and the project manager as agent. European Management Journal, 22(3), 327–336. https://doi.org/10.1016/j.emj.2004.04.010.
Turner, J. R. and Müller, R. (2006). Choosing Appropriate Project Managers: Matching their Leadership Style to the Type of Project. Newtown Square, PA: Project Management Institute.
Turner, J. R., Müller, R. and Dulewicz, V. (2009). Comparing the leadership styles of functional and project managers. International Journal of Managing Projects in Business, 2(2), 198–216.
Unger, B. N., Gemünden, H. G. and Aubry, M. (2012). The three roles of a project portfolio management office: Their impact on portfolio management execution and success. International Journal of Project Management, 30(5), 608–620.
Utterback, J. M. (1994). Mastering the Dynamics of Innovation: How Companies can Seize Opportunities in the Face of Technological Change. Boston, MA: Harvard Business School Press.
Van den Ende, L. and Van Marrewijk, A. (2018). Teargas, taboo and transformation: A neo-institutional study of community resistance and the struggle to legitimize subway projects in Amsterdam 1960–2018. International Journal of Project Management (online). doi:10.1016/j.ijproman.2018.07.003.
Van de Ven, A. (2013). Returning to the frontier of contingency theory of organizational and institutional designs. Academy of Management Annals, 7(1), 393–440.
Van Marrewijk, A. H. (ed.) (2015). Inside Megaprojects: Understanding Cultural Practices in Project Management. Copenhagen: Copenhagen Business School Press.
Van Slyke, D. M. (2006). Agents or stewards: Using theory to understand the government-nonprofit social service contracting relationship. Journal of Public Administration Research and Theory, 17(2), 157–187.
Venkatraman, N. and Kambil, A. (1991). The check’s not in the mail:Strategies for electronic integration. Sloan Management Review, 32(1),33–44.
Villadsen, K. (2010). Governmentality. In M. Tadajewski, P. Maclaran,E. Person and M. Parker (eds), Key Concepts in Critical Management Studies (pp. 125–129). Thousand Oaks, CA: SAGE Publications Inc.
Voss, M. (2012). Impact of customer integration on project portfolio management: Developing a conceptual framework. International Journal of Project Management, 30, 567–581.
Walker, D. H. T., Segon, M. and Rowlinson, S. (2008). Business ethics and corporate citizenship. In D. H. T. Walker and S. Rowlinson (eds), Procurement Systems – A Cross Industry Project Management Perspective (pp. 101–139). Abingdon, UK: Taylor and Francis.
Weber, M. (1930). The Protestant Ethic and the Spirit of Capitalism. London: George, Allen & Unwin.
Weick, K. (1979). The Social Psychology of Organizing. Reading, MA:Addison-Wesley.
Welcomer, S. A. (2002). Firm-stakeholder networks: Organizational responses to external influence and organizational philosophy. Business and Society, 41(2), 251–257.
Wernerfelt, B. (1984). A resource-based view of the firm. Strategic Management Journal, 5(2), 171–180.
Williamson, O. E. (1979). Transaction-cost economics: The governance of contractual relations. Journal of Law and Economics, 22(2), 233–261.
Windeler, A. and Sydow, J. (2001). Project networks and changing industry practices: Collaborative content production in the German television industry. Organization Studies, 22(6), 1035–1060.
Winter, S. G. (2000). The satisficing principle in capability learning. Strategic Management Journal, 21(10–11), 981–996. doi:10.1002/1097-0266(200010/11)21:10/113.0.co;2-4.
Woodward, J. (1965). Industrial Organizations: Theory and Practice. London: Oxford University Press.
Zahra, S. A. and George, G. (2002). Absorptive capacity: A review, reconceptualization, and extension. Academy of Management Review, 27(2),185–203. doi:10.2307/4134351.
Zollo, M. and Winter, S. G. (2002). Deliberate learning and the evolution of dynamic capabilities. Organization Science, 13(3), 339–351.
Zwikael, O., Chih, Y. and Meredith, J. R. (2018). Project benefit management: Setting effective target benefits. International Journal of Project Management, 36(4), 650–658.