Developing Bus Rapid Transit
Show Less

Developing Bus Rapid Transit

The Value of BRT in Urban Spaces

Edited by Fiona Ferbrache

Bus Rapid Transit (BRT) is a popular mode of sustainable public urban transit given dedicated focus in this timely collection. The effects of BRT are examined in-depth through a range of case studies from cities across six continents, including analysis of BRT planning, implementation, operation, performance and impacts. The contributions from academics and non-academic experts on BRT are framed more broadly within the concept of value and how urban transport investment has and can be valued by and for society.
Buy Book in Print
Show Summary Details
You do not have access to this content

Chapter 3: Ottawa-Gatineau: bus rapid transit and metropolitan planning

Gérard Beaudet and Paul Lewis

Abstract

Ottawa’s Transitway is one of the earliest implementations of a bus rapid transit (BRT), and for many a highly successful one. But for others, this system has not been as positive as it should have been, even though it was clearly an improvement over a regular bus system, comparable to what a light rail transit (LRT) could offer. It has been criticized for its exaggerated costs and for having an impact not as great as it should have been on ridership. The BRT can sometimes be viewed as an interim technology, a pre-LRT, while waiting for the conditions to implement an LRT are met. But the BRT was not, and is not, a transitional solution in Ottawa or in many other cities, even though Ottawa has also developed an LRT and is now building a metro downtown. The BRT is a solution well adapted to certain urban contexts, especially mid-densities and moderate ridership. It is well adapted to certain corridors, even in larger metropolises. Other technologies are necessary to face the demand for transit and because of the limits of BRT. Clearly there is a future for BRT in Ottawa and on the other side of the river, in Gatineau, if only because it will be difficult, if not impossible, to develop an extensive network of LRT, even on the Ontario side of the region. The capital costs are too high, and LRT is not adapted to all corridors that need a rapid and frequent service. The BRT is still an alternative in the long run. Therefore, the BRT will most probably coexist with other transit technologies. In that sense, the BRT will be more than an interim solution, waiting for an LRT. It is still a valid solution for Ottawa and for Gatineau.

You are not authenticated to view the full text of this chapter or article.

Elgaronline requires a subscription or purchase to access the full text of books or journals. Please login through your library system or with your personal username and password on the homepage.

Non-subscribers can freely search the site, view abstracts/ extracts and download selected front matter and introductory chapters for personal use.

Your library may not have purchased all subject areas. If you are authenticated and think you should have access to this title, please contact your librarian.


Further information

or login to access all content.